FAQ
Q:Do you have factory?
A:We are 100% integration of factory and trade.
Q:Do you have CE?
A:Yes, we have several, right now we are working towards this part.
Q:How long does it take for the production?
A:Normally start with receiving deposit, it takes about 30 to 45 days to finish the production.
Q:What is your MOQ?
A:It depends, if using our label, for most of items, more than 20 cartons is ok, if using private label, then 100 cartons to be asked.
Q:How can you ensure the quality?
A:First, self quality control system, to make sure everything will be ok, before every step, our team will go and check the production, second, customer inspection, last, CIQ check.